ALEASHA Shower Towel Hook Brushed Nickel, Stainless Steel Towel Hanger, Heavy Duty Double Towel Hook, Towel Holder for Bathroom, Wall Mount Robe Hook

ALEASHA Shower Towel Hook Brushed Nickel, Stainless Steel Towel Hanger, Heavy Duty Double Towel Hook, Towel Holder for Bathroom, Wall Mount Robe Hook

$29.97
Skip to product information
ALEASHA Shower Towel Hook Brushed Nickel, Stainless Steel Towel Hanger, Heavy Duty Double Towel Hook, Towel Holder for Bathroom, Wall Mount Robe Hook

ALEASHA Shower Towel Hook Brushed Nickel, Stainless Steel Towel Hanger, Heavy Duty Double Towel Hook, Towel Holder for Bathroom, Wall Mount Robe Hook

$29.97

About This

  • 【Solid Stainless Steel】Using solid stainless steel pipes, this bathroom towel hook is more heavy-duty and has better weight-bearing capacity compared to others. It is also more waterproof and rust-resistant in humid bathrooms.
  • 【Double Hooks】Double hooks provides more storage room, an ideal replacement for the single hook, good choice for holding bath towels, coats, bags or other stuff.
  • 【Sturdy Design】Designed with hidden screws, this wall-mounted bathroom towel hook has a good load-bearing capacity and a sturdy double hook construction. It is suitable for hanging large items such as coats, bath towels and bags, saving more storage space.
  • 【Easy Installation】We provide with the parts you need for installation and detailed installation instructions, the bathroom towel hook is easy enough to be installed by yourself for a few minites.
  • 【Stylish & Versatile】Streamlined, simple geometric style, designer look. The metal surface is easy to clean and suitable for many decoration styles, making your bathroom style simple and elegant.
  • 【Wide Application】Made of solid and premium stainless steel, rust-proof and durable. Perfect for not only wet bathrooms and toilets, but also for other rooms such as checkrooms, kitchens and bedrooms. A good helper for you to save space.

Overview

  • Color : Brushed Nickel
  • Brand : ALEASHA
  • Material : Stainless Steel
  • Finish Type : Brushed
  • Mounting Type : Wall Mount

You may also like